• Home
  • Company Profile
  • Services
    • Structural Repair & Helifix Micro Piling
    • Concrete Repair, Cathodic Protection & Protective Coatings
    • Façade Cleaning & Maintenance
    • Stone Restoration and Conservation
  • Case Studies
  • Blog
  • Contact Us
Specialist UK Restorations
  • Home
  • Company Profile
  • Services
    • Structural Repair & Helifix Micro Piling
    • Concrete Repair, Cathodic Protection & Protective Coatings
    • Façade Cleaning & Maintenance
    • Stone Restoration and Conservation
  • Case Studies
  • Blog
  • Contact Us

Restoration Works at Leyland Fire Tower

Leyland Fire Tower Concrete Repair to Roof Area

SUKR were appointed as Principal Contractor to carry out restoration works to The Fire Tower in Leyland. The upper cills and roof area were in need of concrete repair due to spalling and damage. Sika 610 and 615 were used for the repair, along with the Sikagard 550W system to protect the newly restored concrete.  We were also helped by LIJ Fluid Power for the restoration of the railings and by Wirral Cladding and Roofing for the protective roof coating.

Posted in: General on June 19th, 2018

Blog Categories

  • General

Contact Us

Head Office

Unit 5 Hurlston Court,
Scarisbrick Business Park,
Ormskirk,
L40 8HN

T: 01704 898 105
F: 01704 898 106
Email Us

Michael Knowles
Company Director
01704 898105

  • Lancashire
  • Liverpool
  • Manchester
  • Leeds
  • Nottingham
  • Birmingham


© 2025 Specialist UK Restorations Limited. All rights reserved.

Site by Cultivate