Successful removal and replacement of a defective concrete floor slab at one of Kimberley-Clark’s live manufacturing/distribution facilities.
The existing slab was broken up, then prepped with steel reinforcement and shuttering, before new concrete was poured to form a new slab.
Posted in: General on January 12th, 2018