
Ongoing works at Hawthorne Flats, Bootle.
Existing defective screed and tiles removed, concrete substrate mechanically prepared to 2 stairs and communal areas in preparation to receive Sika Hardtop 80 finished with Sika Pronto non slip system.
Completed shots to follow.
Posted in: General on March 10th, 2017