• Home
  • Company Profile
  • Services
    • Structural Repair & Helifix Micro Piling
    • Concrete Repair, Cathodic Protection & Protective Coatings
    • Façade Cleaning & Maintenance
    • Stone Restoration and Conservation
  • Case Studies
  • Blog
  • Contact Us
Specialist UK Restorations
  • Home
  • Company Profile
  • Services
    • Structural Repair & Helifix Micro Piling
    • Concrete Repair, Cathodic Protection & Protective Coatings
    • Façade Cleaning & Maintenance
    • Stone Restoration and Conservation
  • Case Studies
  • Blog
  • Contact Us

Categories

  • Concrete Repair, Cathodic Protection & Protective Coatings
  • Façade Cleaning & Maintenance
  • Stone Restoration & Conservation
  • Structural Repair & Helifix Micro Piling

Block 17 – 27 Studland Road, Liverpool, Parapet wall stabilisation works

Project: Block 17 - 27 Studland Road, Liverpool, Parapet wall stabilisation works
Client: Cobalt Housing


As an approved installer of Helifix Ltd, Specialist UK Restorations were appointed as Principal Contractor by Cobalt Housing on a parapet wall stabilisation scheme to block of housing which forms part of their affordable housing stock. The block of properties in question were suffering from structurally significant leaning of parapet walls due to the lack of adequate lateral restraint between the external walls and floor joists, beams & partitions. Defects of this nature are common in properties built pre 1914, in end of terrace or semi-detached three storey houses. The Helifix designed restraint system formed the majority of the works, and included installation of Helifix BowTies into first floor ceiling joint ends. Bed joint reinforcement (using twin chord 6mm HeliBars) the full length of each parapet including a 500mm return to the gable. Removal of copings to allow access for vertically drilling and installing Helifix CemTies into the sound masonry of the main wall ensuring embedment to a minimum of 225mm. Once all structural works were complete we also undertook the decorative elements to include full parapet gutter relining, external sand/cement rendering and application of an approved masonry paint to the entire front elevation. Successful completion of the works included meeting the agreed programme, with any tenants remaining in-situ throughout, and provision of a 10 year Helibeam System Approved Installer Guarantee.

Posted in: Structural Repair & Helifix Micro Piling on June 27th, 2014

Contact Us

Head Office

Unit 5 Hurlston Court,
Scarisbrick Business Park,
Ormskirk,
L40 8HN

T: 01704 898 105
F: 01704 898 106
Email Us

Michael Knowles
Company Director
01704 898105

  • Lancashire
  • Liverpool
  • Manchester
  • Leeds
  • Nottingham
  • Birmingham


© 2025 Specialist UK Restorations Limited. All rights reserved.

Site by Cultivate