SUKR were appointed as Principal Contractor to carry out restoration works to The Fire Tower in Leyland. The upper cills and roof area were in need of concrete repair due to spalling and damage. Sika 610 and 615 were used for the repair, along with the Sikagard 550W system to protect the newly restored concrete. We were also helped by LIJ Fluid Power for the restoration of the railings and by Wirral Cladding and Roofing for the protective roof coating.
Posted in: General on June 19th, 2018